Wtomike

Overwatch Water Cooling Desk Mod "Dragons"

Recommended Posts

Wtomike    0

4. Water Cooling system setup

 

This is the hardest and the most time-consuming part. Water loop needs to go through three areas: Animation scene, component area, and radiators.

During the installation process, even though pipes are planned in advance, but when actually putting them together, problems occur so it’s not 100% connected according to plan, making the process both harder and takes longer.

 

There are some difficulties when connecting hardline pipe between areas. Half of both areas needs to be finished first, get tested for any water leaks, and only if they are properly connected and sealed off, the following pipes can be installed.

 

2gKCXQu.jpg

 

6J72re2.jpg

 

akze3aP.jpg

 

kUG1uqm.jpg

 

35aXbVg.jpg

 

B4cJAfK.jpg

 

AJrzRSi.jpg

 

cEKsNrR.jpg

 

QlfGxDi.jpg

 

NLFmCQ1.jpg

 

qVSh3d9.jpg

 

 

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.