SHI MIN 1 Posted June 2, 2016 (edited) Edited June 2, 2016 by SHI MIN 1 Quote Share this post Link to post Share on other sites
SHI MIN 1 Posted June 12, 2016 top-level design bolster This is attached to the bore a hole 3mm use CARBON Sticker Quote Share this post Link to post Share on other sites
SHI MIN 1 Posted June 12, 2016 Waiting for a long time DC Putter point of application on one side Structural reinforcement,increase in aluminum scroll saw processing Retention needed portion Confirm a fixed position bore a hole fixed Quote Share this post Link to post Share on other sites
SHI MIN 1 Posted June 12, 2016 Putter bracing frame excision bore a hole fixed \ Quote Share this post Link to post Share on other sites
SHI MIN 1 Posted June 12, 2016 Spray painting Silver Spray painting Silver gray sanding Spray painting black Quote Share this post Link to post Share on other sites
SHI MIN 1 Posted June 12, 2016 DC Putter control PCB DIY Provides six 3PIN ,Let other peripheral use Switch fixed Control opening and closing Quote Share this post Link to post Share on other sites
SHI MIN 1 Posted June 12, 2016 Test waterway https://youtu.be/-qZ6RJdnVl4 DC Putter control test https://youtu.be/DRSlrGHn8sI https://youtu.be/YXE-21-zttU Quote Share this post Link to post Share on other sites
SHI MIN 1 Posted June 12, 2016 prop up seat processing Quote Share this post Link to post Share on other sites